Eagle (1918)

Scale 1:96. Plan shows the platform deck, as fitted for the aircraft carrier Eagle (1918). The drawing shows alterations in sienna ink made at Malta Dockyard and green ink made Devonport Dockyard dated April 1933. A Malta Dockyard Manager of Constructive Department stamp dated 28 December 1927 is printed on the plan. tables detailing the magazine and Bomb room contents on this deck are printed above and below the drawing. This drawing is Sheet 10 of 12.
Close

Your Request

If an item is shown as “offsite”, please allow eight days for your order to be processed. For further information, please contact Archive staff:

Email:
Tel: (during Library opening hours)

Click “Continue” below to continue processing your order with the Library team.

Continue