Platform
platform
NMM, Progress Book, volume 5, folio 298, states that 'Chiffonne' arrived at Woolwich Dockyard on 3 March 1803 and was docked on 8 April to be recoppered. She was undocked on 23 May 1803, and sailed on 17 June 1808 having been fitted.
NMM, Progress Book, volume 6, folio 373, states that 'Chiffonne' went to Sheerness Dockyard in 1804 for defects to be sorted, and then in 1808 and 1811 to Portsmouth Dockyard for repairs.
NMM, Progress Book, volume 5, folio 298, states that 'Chiffonne' arrived at Woolwich Dockyard on 3 March 1803 and was docked on 8 April to be recoppered. She was undocked on 23 May 1803, and sailed on 17 June 1808 having been fitted.
NMM, Progress Book, volume 6, folio 373, states that 'Chiffonne' went to Sheerness Dockyard in 1804 for defects to be sorted, and then in 1808 and 1811 to Portsmouth Dockyard for repairs.
Object Details
ID: | ZAZ2281 |
---|---|
Collection: | Ship Plans |
Type: | Platform |
Display location: | Not on display |
Vessels: | Chiffonne fl.1801 (French, captured) |
Date made: | ca.1801 |
Credit: | © Crown copyright. National Maritime Museum, Greenwich, London |
Measurements: | 265 mm x 995 mm |