Sapphire (1827)
Scale 1:48. Plan showing the quater deck and forecastle, with covered waist, for Sapphire (1827), a 28-gun, Sixth Rate, prior to being converted to a troopship
Maker: James Wicher.
NMM Progress Book, volume 6, folio 548, states that 'Sapphire' arrived at Portsmouth Dockyard on 4 August 1838 and docked on 20 October 1839. She was undocked on 27 September 1938, and sailed on 3 November 1839 after being refitted for troops. The cost was £5,541.
Maker: James Wicher.
NMM Progress Book, volume 6, folio 548, states that 'Sapphire' arrived at Portsmouth Dockyard on 4 August 1838 and docked on 20 October 1839. She was undocked on 27 September 1938, and sailed on 3 November 1839 after being refitted for troops. The cost was £5,541.
For more information about using images from our Collection, please contact RMG Images.
Object Details
ID: | ZAZ3371 |
---|---|
Collection: | Ship Plans |
Type: | Technical drawing |
Display location: | Not on display |
Vessels: | Sapphire (1827) |
Date made: | 1839 |
Credit: | © Crown copyright. National Maritime Museum, Greenwich, London |
Measurements: | Sheet: 305 mm x 842 mm |