Upper deck plan
Upper deck plan
NMM, Progress Book, volume 7, folio 65, states that the 'Hermes' was built at Portsmouth Dockyard between May 1810 and 22 July 1811 when she was launched. She was docked on 23 July to be coppered, and sailed on 7 September 1811 having been fitted.
NMM, Progress Book, volume 7, folio 65, states that the 'Hermes' was built at Portsmouth Dockyard between May 1810 and 22 July 1811 when she was launched. She was docked on 23 July to be coppered, and sailed on 7 September 1811 having been fitted.
For more information about using images from our Collection, please contact RMG Images.
Object Details
ID: | ZAZ3847 |
---|---|
Collection: | Ship Plans |
Type: | Upper deck plan |
Display location: | Not on display |
Vessels: | Hermes (1811) |
Date made: | 1810 |
Credit: | © Crown copyright. National Maritime Museum, Greenwich, London |
Measurements: | 290 mm x 905 mm |